Derniers sujets
» Photos credits Mimouni pictures copyrighted mimouni
par abkarian Lun Déc 14, 2015 12:47 pm

» La femme de kadhafi et son serpent ثعبان زوجة القذافي
par aokas Mar Mar 17, 2015 7:24 pm

» Evolution n'est pas revolution
par aokas Mar Mar 17, 2015 7:11 pm

» La video de kadhafi qui a enragé sarkozy
par aokas Dim Fév 16, 2014 1:47 pm

» 30 photos montrant le calvaire de Kadhafi pendant sa mise a mort
par aokas Dim Fév 16, 2014 1:45 pm

» Tous les herissons ont des épines
par aokas Dim Fév 16, 2014 1:44 pm

» Sitemap Dieux terrestres
par Admin Mer Oct 23, 2013 12:49 pm

» Mimouni act الميموني ملخص Tag # الميموني
par Admin Mer Oct 23, 2013 12:22 am

» Le peuple Yemenite a eu raison de son dictateur
par abkarian Mar Oct 22, 2013 10:31 pm

» Yemen ali abdallah saleh علي عبدالله صالح-
par abkarian Mar Oct 22, 2013 10:28 pm

» La fille de kaadhafi aicha عايشة القذافي
par abkarian Mar Oct 22, 2013 10:24 pm

» Ben Ali 20 tonnes d'or pour ...histoire d'epouses
par abkarian Mar Oct 22, 2013 10:21 pm

» Ben Ali 20 tonnes d'or pour ...histoire d'epouses
par abkarian Mar Oct 22, 2013 10:20 pm

» FUITE DE LA FAMILLE BENALI هروب بن علي من تونس
par abkarian Mar Oct 22, 2013 10:16 pm

» ben Ali de Tunisie et sa famille
par abkarian Mar Oct 22, 2013 10:13 pm

» Moubarak Empereur et moubarak prisonnier
par abkarian Mar Oct 22, 2013 10:09 pm

» Le choc kadafi empereur et kadhafi prisonnier
par abkarian Mar Oct 22, 2013 9:59 pm

» Le calvaire vécu par Kadhafi par Mimouni
par abkarian Mar Oct 22, 2013 9:52 pm

» Kadhafi infecté par la folie des grandeurs
par abkarian Mar Oct 22, 2013 9:37 pm

» مبارك والعائلة .. السقوط المدوي
par abkarian Mar Oct 22, 2013 7:22 pm


Kadhafi : l'homme qui créa la grande rivière

Voir le sujet précédent Voir le sujet suivant Aller en bas

Kadhafi : l'homme qui créa la grande rivière

Message par faraon le Mer Oct 26, 2011 4:47 pm

Kadhafi : l'homme qui créa la grande rivière


GMR (Great Man-made River) Water Supply Project, Libya
http://www.water-technology.net/projects/gmr/
Contracts were awarded in 2001-02 for the next phase of Libya's Great Man-Made River Project, an enormous, long-term undertaking to supply the country's needs by drawing water from aquifers beneath the Sahara and conveying it along a network of huge underground pipes.

In October 2001, the Great Man-Made River Authority (GMRA) awarded an $82 million contract for the construction of major new pumping facilities to a consortium led by Frankenthal KSB Fluid Systems. In January the following year, the Nippon Koei / Halcrow consortium was selected to provide the preliminary engineering and design works for Phase III of the operation, worth $15.5 million.

The pumping station is scheduled to be completed in the summer of 2004 and KSB will subsequently be responsible for servicing the plant and providing technical support for one year after completion. The preliminary stages of phase III run until June 2005, though it is anticipated that GMRA will invite tenders for the detailed design and construction works towards the end of 2004.

When completed, phase III, which requires an additional 1,200km of pipeline, will ultimately increase the total daily supply capacity of the existing system to 3.68 million m³ and provide a further 138,000m³/day to Tobruk and the coast.

faraon

Messages : 51
Date d'inscription : 10/02/2011
Age : 32

Voir le profil de l'utilisateur

Revenir en haut Aller en bas

Re: Kadhafi : l'homme qui créa la grande rivière

Message par faraon le Mer Oct 26, 2011 4:48 pm

The GMR project - the world's largest engineering venture - is intended to transport water from these aquifers to the northern coastal belt, to provide for the country's 5.6 million inhabitants and for irrigation. Intended to be the showpiece of the Libyan revolution, Colonel Moammar Gaddafi called it the "eighth wonder of the world".

First conceived in the late 1960s, the initial feasibility studies were conducted in 1974 and work began ten years later. The project, which still has an estimated 25 years to run, was designed in five phases. Each one is largely separate in itself but will eventually combine to form an integrated system.

faraon

Messages : 51
Date d'inscription : 10/02/2011
Age : 32

Voir le profil de l'utilisateur

Revenir en haut Aller en bas

Re: Kadhafi : l'homme qui créa la grande rivière

Message par faraon le Mer Oct 26, 2011 4:48 pm

PHASES I AND II

The first and largest phase, providing 2 million m³/day along a 1,200km pipeline from As-Sarir and Tazerbo to Benghazi and Sirt, via the Ajdabiya reservoir, was formally inaugurated in August 1991. This was a massive undertaking, using a quarter of a million sections of concrete pipe, 2.5 million t of cement, 13 million t of aggregate, 2 million km of pre-stressed wire and requiring 85 million m³ of excavation, for a finished cost of $14 billion.

The Tazerbo wellfield consists of both production and piezometric observation wells and yields around 1 million m³/day at a rate of 120L/s per well. Only 98 of the 108 production wells are used, with the others on stand-by. A collection network conveys the water to a 170,000m³ off-line steel header tank. From here, the main conveyance system is routed 256km to the north, to two similar header tanks at Sarir, where the second Phase I wellfield is located. A further 1 million m³ is produced here, using 114 of the 126 production wells, at an average flow rate of 102L/s per well. The wells at both Tazerbo and Sarir are about 450m deep and are equipped with submersible pumps at a depth of 145m.

From Sarir, two parallel, 4m-diameter pipelines convey the now chlorine-treated water to the 4 million m³ Ajdabiya holding reservoir, 380km to the north. The water flows from this 900m-diameter reservoir through two pipelines, one heading west to Sirt and the other north to Benghazi. Each pipeline discharges into a circular earth embankment end reservoir, with a storage capacity of 6.8 million m³ at Sirt and 4.7 million m³ at Benghazi, which have been designed to balance fluctuations in supply and demand. In addition, large reservoirs - 37 million m³ in the Sirt area and 76 million m³ in Benghazi - have been built to act as storage facilities for summer or drought conditions.

Phase II delivers 1 million m³/day from the Fezzan region to the fertile Jeffara plain in the western coastal belt and also supplies Tripoli. The system starts at a wellfield at Sarir Qattusah, consisting of 127 wells distributed along three east-west collector pipelines and ultimately feeds a 28 million m³ terminal reservoir at Suq El Ahad.

PHASE III

Phase III falls into two main parts. Firstly, it will provide the planned expansion of the existing Phase I system, adding an additional 1.68 million m³/day along with 700km of new pipeline and new pumping stations to produce a final total capacity to 3.68 million m³/day. Secondly, it will supply 138,000m³/day to Tobruk and the coast from a new wellfield at Al Jaghboub. This will require the construction of a reservoir south of Tobruk and the laying of a further 500km of pipeline.

The preliminary engineering and design contract runs for 41 months and includes geotechnical and topographic surveys. The conceptual designs phase features extensive consideration of pipeline routing and profiling, hydraulics, pumping stations, M&E, control / communications system, reservoirs and other structures, corrosion control, power, operational support and maintenance provision. The evaluation of tenders for the detailed design is expected in the first quarter of 2005.

The last two phases of the project involve the extension of the distribution network together with the construction of a pipeline linking the Ajdabiya reservoir to Tobruk and finally the connection at Sirt of the eastern and western systems into a single network.

When completed, irrigation water from the GMR will enable about 155,000ha of land to be cultivated - echoing the Libyan leader's original prediction that the project would make the desert as green as the country's flag.

KEY PLAYERS

The project is owned by the Great Man-made River Authority and funded by the Libyan Government. Brown & Root and Price Brothers produced the original project design and the main contractor for the initial phases was Dong Ah, with Enka Construction and Al Nah acting as sub-contractors. The preliminary engineering and design contractor for Phase III is Nippon Koei / Halcrow consortium. The Frankenthal KSB consortium won the pumping station construction and technical support contract and SNC-Lavalin are responsible for the pipe production plant O&M. Libyan Cement supplied the concrete. Thane-Coat and Harkmel provided pipeline coating services and Corrintec supplied the cathodic protection system. Thyssen Krupp Fördertechnik provided technical services for the excavation planning and a number of local companies carried out elements of the construction and ancillary work.

faraon

Messages : 51
Date d'inscription : 10/02/2011
Age : 32

Voir le profil de l'utilisateur

Revenir en haut Aller en bas

Re: Kadhafi : l'homme qui créa la grande rivière

Message par Contenu sponsorisé


Contenu sponsorisé


Revenir en haut Aller en bas

Voir le sujet précédent Voir le sujet suivant Revenir en haut

- Sujets similaires

 
Permission de ce forum:
Vous ne pouvez pas répondre aux sujets dans ce forum